Services

What you can book.

Know what is on record, find what is actually there, mark it, and prove it where it matters. Locating and mark-outs can be booked without a Spot On drilling crew.

ElectromagneticGPRBore trackingPotholingMark-outsBYDA plans

Electromagnetic service locating

Radiodetection RD8200

Electromagnetic locating traces conductive services: power and communications cables, metallic pipes, and non-metallic pipes that carry a tracer wire.

The locator picks up signals already present on a service, or a signal applied to it with a transmitter, and the service is followed across the site. Positions are then marked on the surface in the colour for that service type.

  • Suits trenching, pits, footings and bore paths
  • Instrument: Radiodetection RD8200 with a current calibration certificate
Best for
Trenching, pits, footings and bore paths where conductive services may be present.
What happens on site
BYDA plans are reviewed, the site is walked, and conductive services are traced with the RD8200. Marks go on the surface in the service colours.
What you receive
Surface marks for each traced service, with the AS 5488 quality level noted per mark.
Limits
Traces conductive services only. Non-metallic pipes without a tracer wire cannot be traced this way, and depth is confirmed only by potholing.

Ground-penetrating radar

Subject to operational confirmation

Ground-penetrating radar (GPR) sends pulses into the ground and records reflections from buried objects, including non-metallic services that electromagnetic locating cannot trace.

A GuidelineGeo MALA GPR system is held. The service is offered subject to operational confirmation: ask when you enquire whether GPR is available for your job and dates.

Best for
Areas where non-metallic services or unrecorded buried objects are suspected.
What happens on site
The ground is scanned with the GPR system and reflections are interpreted and marked on the surface.
What you receive
Surface marks for what is detected, if GPR is confirmed for your job.
Limits
Offered subject to operational confirmation. Results depend on ground conditions, and depth is confirmed only by potholing. To confirm

Bore tracking

DigiTrak walkover

During horizontal directional drilling, a transmitter in the drill head is followed from the surface with a walkover receiver.

The tracker reads the head's position and depth so the bore holds its planned path and stays clear of located services. It is used on Spot On drilling projects. If you need tracking on your own bore, tell us about the job.

Best for
Horizontal directional drilling where the bore path must stay clear of located services.
What happens on site
A transmitter in the drill head is followed from the surface with a DigiTrak Falcon F5 walkover receiver. Two units are held.
What you receive
Head position and depth read from the surface during the bore.
Limits
Used on Spot On drilling projects. Tracking on another contractor's bore is discussed job by job.

Potholing and vacuum excavation

Arranged with Spot On Excavations

Potholing exposes a service so its position and depth are confirmed by sight.

It is done by vacuum excavation, which loosens soil with water or air and removes it by suction rather than with a digging bucket. Vacuum excavation trucks run under sister company Spot On Excavations, and potholing is arranged with them as part of your locate.

Spot On Excavations

Best for
Confirming the position and depth of a service by sight before excavation or drilling.
What happens on site
Spot On Excavations exposes the service by vacuum excavation. Gas detectors are used where the pit needs atmosphere checks.
What you receive
A service exposed and seen, so its position and depth can be measured (AS 5488 quality level A).
Limits
Arranged with Spot On Excavations, not run by Locate and Detect.

BYDA plan review

Before You Dig Australia (BYDA) is the national referral service for information on underground assets.

BYDA plans show what asset owners have on record. They are a starting point, not a location. We review the plans for your site before locating, then compare what is recorded with what is found. Send the plans with your enquiry if you already have them.

Best for
Any job, as the first step before a site visit.
What happens on site
The BYDA plans are reviewed against the site and the work, and the site is walked to compare records with what is visible.
What you receive
A note of what the plans show and where they leave gaps. A photo and sketch record of the mark-out is available on request. To confirm
Limits
Plans show what asset owners have on record. They are not a location, and they can be incomplete.
ASMark-outs and quality levels

How much can you rely on a mark?

AS 5488 is the Australian Standard for classifying subsurface utility information. It grades information by how it was obtained, from D (records only) to A (exposed and measured).

The grade tells a designer or crew how much weight to put on a mark-out. Tell us the quality level your job requires. Electromagnetic locating and GPR produce detected information on site. Quality level A needs the service to be exposed, which is arranged with Spot On Excavations.

Plain-language summary only. The standard sets out the full requirements for each level.

  1. QLD

    From records

    Taken from existing plans, such as BYDA responses, or from anecdotal information. Nothing checked on site.

  2. QLC

    Records plus surface features

    Plan information checked against what can be seen on site: pits, valves, markers and lids.

  3. QLB

    Detected on site

    The service is traced with locating equipment and its position is marked on the ground.

  4. QLA

    Exposed and measured

    The service is uncovered, usually by potholing, and its position and depth are measured directly.

Book a locate

Need a locate on its own?

Send with your enquiry

  • 01Site address and the area to locate
  • 02BYDA plans, if you already have them
  • 03What is being dug or drilled, and how deep
  • 04Preferred dates